Supply to Hancock Energy

The Hancock Energy Belisama Gas Project will develop the Lockyer gas field located approximately 360km north of Perth, 40km East of Dongara and 15km West of Mingenew.  The Lockyer gas field is located within Production Licences in EP368 and EP426. The constructed Belisama Gas Project will comprise:

  • Conventional gas production wells
  • An upstream gas gathering network comprising wellhead facilities, infield hubs, and connecting flow lines.  Flow from individual well flow lines will be aggregated at hubs prior to being directed into hub flow lines which will transport the produced fluids to a central processing facility (CPF);
  • A CPF, comprising gas treatment, condensate stabilisation and produced water treatment.  Raw gas will be treated to allow export via the Dampier-Bunbury Natural Gas Pipeline (DBNGP), and hydrocarbon condensate will be treated to all road transport. A condensate storage and truck loading system will be included as part of the CPF; and
  • ​A gas export trunk line connecting the CPF to the DBNGP.

The CPF will be located on a green fields site and will not be connected to existing utilities infrastructure. All utilities and supporting infrastructure required to support the field operations and on-site personnel will be designed, procured, and constructed, including power generation, electrical distribution, water treatment and distribution, safety, control and communication systems, offices and amenities, workshops and warehouses, and other systems typically required for hydrocarbon facilities (air, nitrogen, chemicals etc.).

Supplier Application Form

Business Details(Required)
Contact Person(Required)
Please provide details of services or products that you provide. Details of your response will be used to match your business to supply opportunities based on keyword searches, so please provide a comprehensive yet concise summary.
Categories(Required)
Please select up to five of the below to describe the categories your business works in.
Accepted file types: pdf, Max. file size: 8 MB.
Please attach a capability statement for your business which appropriately describes what your business could provide for Hancock Energy.
This field is for validation purposes and should be left unchanged.

Hancock Energy is a Hancock Prospecting company.

top button